LeafLabs Maple solderpad
leaflabs-maple / test-procedures / maple-test-procedures.lyx
#LyX 1.6.5 created this file. For more info see http://www.lyx.org/
\lyxformat 345
\begin_document
\begin_header
\textclass article
\use_default_options true
\language english
\inputencoding auto
\font_roman default
\font_sans default
\font_typewriter default
\font_default_family default
\font_sc false
\font_osf false
\font_sf_scale 100
\font_tt_scale 100
\graphics default
\paperfontsize default
\spacing single
\use_hyperref false
\papersize default
\use_geometry true
\use_amsmath 1
\use_esint 1
\cite_engine basic
\use_bibtopic false
\paperorientation portrait
\leftmargin 2cm
\topmargin 2cm
\rightmargin 2cm
\bottommargin 2cm
\secnumdepth 3
\tocdepth 3
\paragraph_separation indent
\defskip medskip
\quotes_language english
\papercolumns 1
\papersides 1
\paperpagestyle default
\tracking_changes false
\output_changes false
\author ""
\author ""
\end_header
\begin_body
\begin_layout Title
LeafLabs Maple QA and Preparation Procedures
\end_layout
\begin_layout Date
Last modified 07/27/2010
\end_layout
\begin_layout Author
Bryan Newbold <bnewbold@leaflabs.com>
\end_layout
\begin_layout Standard
There are several degrees of quality assurance testing to be done on newly
fabricated Maple boards.
First, after any design change, there is in-depth electrical characterization
and feature testing to be done.
Second, with any new batch of boards produced (especially by a new manufacturer
or alternative components) there is a comprehensive electrical checklist.
Finally, every single board that is sold must be flashed with a bootloader
and initial program, then run through a rapid electrical test.
This document describes the steps for the later two; characterization of
new features or design changes is a more subtle task for an engineer.
\end_layout
\begin_layout Standard
See the end of this document for a per-board testing checklist.
\end_layout
\begin_layout Section*
Per-batch Electrical Testing Instructions
\end_layout
\begin_layout Standard
The intent of this testing is to ensure that the boards work
\begin_inset Quotes eld
\end_inset
as advertised
\begin_inset Quotes erd
\end_inset
with the manufacturing techniques and sourced components that are usually
in some way unique to a given batch of boards.
For example, if a cheaper oscillator crystal with all the same specifications
from a different source is used, all the functionality of the board needs
to be tested.
\end_layout
\begin_layout Standard
This testing isn't as straight forward as the per-board directions below.
It's up to the technician/engineer to be a detective and search out problems;
we usually spend an hour or two running these tests and writing up the
results.
Tests should be run on at least 2-3 boards randomly selected from the batch,
with at least one NOT from the top or bottom sheet.
Common tests are:
\end_layout
\begin_layout Itemize
Test EXT power up to the rated voltage (maximum and minimum)
\end_layout
\begin_layout Itemize
SerialUSB and USART read/write at maximum speeds, looking for corruption
or dropped data
\end_layout
\begin_layout Itemize
Look at PWM and communications waveforms with an oscilloscope; check for
excess noise/ringing/crosstalk
\end_layout
\begin_layout Itemize
Test power consumption
\end_layout
\begin_layout Itemize
Test battery charging circuit and status LEDs
\end_layout
\begin_layout Itemize
Inspect the
\begin_inset Formula $V_{cc}$
\end_inset
and
\begin_inset Formula $V_{analog}$
\end_inset
regulated voltages for accuracy and USB and USART crosstalk using an oscillosco
pe.
\end_layout
\begin_layout Itemize
Test PWM on all pins labeled as such
\end_layout
\begin_layout Itemize
Test ADC input on all pins labeled as such with GND, ~1.5v (battery), and
\begin_inset Formula $V_{cc}$
\end_inset
.
All pins should make statistically comparable readings.
\end_layout
\begin_layout Itemize
Check GPIO read/write on all pins
\end_layout
\begin_layout Itemize
Look at the oscillator waveform on an oscilloscope
\end_layout
\begin_layout Itemize
Let the board crunch numbers, charge battery, and USB read/write for a couple
minutes and make sure no components get hot
\end_layout
\begin_layout Standard
Testing ADC noise and accuracy is the most ambiguous; it's tricky to do
without an communications channel running which will increase crosstalk
noise, and we haven't researched the STM32 ADC peripheral enough to distinguish
between systematic noise in our design and improper sampling technique
(eg, mismatched impedance).
\end_layout
\begin_layout Standard
After all this testing, the first 10 boards that go through the per-board
testing may turn up additional issues, so it's helpful to get those prepared
at the same time to catch all problems as soon as possible.
\end_layout
\begin_layout Section*
Per-board Preparation and Testing Instructions
\end_layout
\begin_layout Standard
These tests should be run on every single Maple board that will be shipped.
When the customer receives the board it should be in a static baggie labeled
with the revision number and instructions (or a URL to instructions) on
it, the board should have two jumpers on the power select header (battery
charge
\begin_inset Quotes eld
\end_inset
open
\begin_inset Quotes erd
\end_inset
), and the board should be programmed with both the bootloader and a recent
version of the interactive test program.
\end_layout
\begin_layout Standard
In preparation, you'll need:
\end_layout
\begin_layout Itemize
a partially charged 3.3v LiPo battery with a compatible connector
\end_layout
\begin_layout Itemize
a computer with all the required software
\end_layout
\begin_layout Itemize
Mini-B USB cable
\end_layout
\begin_layout Itemize
Serial-USB adapter (FTDI) with jumper wires to connect to Maple USART
\end_layout
\begin_layout Itemize
a supply of header jumpers (2x per board)
\end_layout
\begin_layout Itemize
a
\begin_inset Quotes eld
\end_inset
test shield
\begin_inset Quotes erd
\end_inset
(a modified Maple board with different headers; instructions below)
\end_layout
\begin_layout Standard
This entire process goes better as an assembly line with one person at a
computer doing software and another person doing the more mechanical tests
and attaching/removing the test shield.
For speed we usually put aside any board that seems suspicious at all with
a post-it note or tape attached explaining the issue; we then revisit these
boards at the end or pass them off to an engineer for investigation or
repair.
We average something like 1 in 12 boards being flakey for any reason; some
of these may even be due to human error during testing (eg, twitchy hands,
keyboard typos, paranoia, whatever).
These boards are still appropriate for software development or internal
projects, so we retest or fix them quickly by hand but never ship them.
Any errors on the part of the manufacturer are noted and communicated as
feedback to help them with their QA/process.
\end_layout
\begin_layout Standard
Note that the Maple rev4 is identical to the rev3 except for silkscreen
fixes.
The rev3 needed part of the silkscreen erased or sharpied over during preparati
on.
\end_layout
\begin_layout Subsection*
\series bold
Brief visual inspection of board
\end_layout
\begin_layout Standard
This first step doesn't make much sense until you pick up a board and notice
that one of the buttons just isn't there or that the silkscreen is out
of focus, or that two headers are soldered together, etc.
The care that should be taken depends on how much the batch is trusted
as a whole: things to look out for should be identified in the per-patch
inspection.
The most common things we have trouble with are the buttons (give them
firm nudge and make sure they don't pop off), shorts between STM32 pins,
bad soldering on the female headers, and big solder lumps on the barrel
jack connector.
\end_layout
\begin_layout Standard
For the first 10 boards in a batch it's worth spending 30 seconds a board
and perhaps using a loupe or microscope.
After that it's usually a 10 second glance to check the silkscreen and
any large issues.
The later testing steps should catch most other problems.
\end_layout
\begin_layout Standard
\align center
\begin_inset Float figure
placement h
wide false
sideways false
status collapsed
\begin_layout Plain Layout
\align center
\begin_inset Graphics
filename unmelted-solder.jpg
lyxscale 10
height 5cm
\end_inset
\end_layout
\begin_layout Plain Layout
\align center
\begin_inset Graphics
filename header-short.jpg
lyxscale 10
height 5cm
\end_inset
\begin_inset Graphics
filename overheated-reset-button.jpg
lyxscale 10
height 5cm
\end_inset
\end_layout
\begin_layout Plain Layout
\begin_inset Caption
\begin_layout Plain Layout
A selection of defective Maple boards: solder shorts (left), un-melted solder
paste (top), and an overheated Reset button (right)
\end_layout
\end_inset
\end_layout
\end_inset
\end_layout
\begin_layout Subsection*
Attach Jumpers
\end_layout
\begin_layout Standard
Usually the power select jumpers are not attached during production and
are added at this stage.
The power select jumper should be on USB and the battery charger should
be half attached.
\end_layout
\begin_layout Standard
\align center
\begin_inset Float figure
placement H
wide false
sideways false
status collapsed
\begin_layout Plain Layout
\align center
\begin_inset Graphics
filename jumpers.jpg
width 8cm
\end_inset
\end_layout
\begin_layout Plain Layout
\begin_inset Caption
\begin_layout Plain Layout
Proper jumper configuration: USB power selected and battery charger jumper
attached but
\begin_inset Quotes eld
\end_inset
open
\begin_inset Quotes erd
\end_inset
\end_layout
\end_inset
\end_layout
\begin_layout Plain Layout
\end_layout
\end_inset
\end_layout
\begin_layout Standard
This half-attachment is a bit controversial..
the connection could be closed with no real problem except that charging
LEDs have undefined state and could be confusing to the user.
The jumper could also be floating in the static bag, but then it could
be lost or forgotten.
\end_layout
\begin_layout Subsection*
Flash bootloader
\end_layout
\begin_layout Standard
The bootloader can be flashed either over JTAG or via the hardware serial
bootloader interface.
The JTAG header is not populated by default and using the serial bootloader
tests that feature, so we usually use that.
\end_layout
\begin_layout Standard
You can get the stm32loader.py script from our maple-bootloader git repository
at
\begin_inset Flex URL
status collapsed
\begin_layout Plain Layout
http://github.com/leaflabs/maple-bootloader
\end_layout
\end_inset
; this script (written by a third party) requires the PySerial library as
well as a python runtime installed.
\end_layout
\begin_layout Standard
The most recent version of the bootloader is from the 9c5f8e...
git revision of the maple-bootloader reporisory.
For safety we always use the same compiled binary file, when can be downloaded
from
\begin_inset Flex URL
status collapsed
\begin_layout Plain Layout
http://static.leaflabs.com/pub/leaflabs/maple-bootloader/maple_boot-rev3-9c5f8e.bin
\end_layout
\end_inset
.
Using this file you should not have to checkout or recompile the bootloader;
you will need to compile the interactive test session program (below).
\end_layout
\begin_layout Standard
On linux with an FTDI device as /dev/ttyUSB0, the command is usually something
like:
\end_layout
\begin_layout Verse
\family typewriter
stm32loader.py -p /dev/ttyUSB0 -evw maple_boot-rev3-9c5f8e.bin
\end_layout
\begin_layout Standard
The procedure is to connect both an FTDI chip and the Maple to a computer
via USB; note that the Maple status light will not light up because there
is no bootloader installed.
Then connect the FTDI chip to the Serial1 USART device, which has TX1 on
pin 7 and RX1 on pin 8; wiring Ground to the header between pins 13 and
14 makes the wiring easy:
\end_layout
\begin_layout Standard
\align center
\begin_inset Float figure
placement H
wide false
sideways false
status collapsed
\begin_layout Plain Layout
\align center
\begin_inset Graphics
filename serial-bootloader.jpg
width 8cm
\end_inset
\end_layout
\begin_layout Plain Layout
\begin_inset Caption
\begin_layout Plain Layout
Serial1-to-FTDI wiring example for hardware serial bootloader uploading
\end_layout
\end_inset
\end_layout
\end_inset
\end_layout
\begin_layout Standard
Once wired up, you can enter hardware serial bootloader mode by holding
the BUT button all the way down, pressing the Reset button for a second
or two and release while keeping BUT down, then release BUT a couple seconds
later.
There will still be no sign of life from the Maple, so this can take a
couple tries at first.
Finally the above command can be run; the command output should show a
long scroll of memory writes, and then an equally long set of verifications,
then success.
At this point you can reset the Maple and the blue status LED should blink
perpetually (the board is in regular perpetual bootloader mode because
there is no user program to run).
If the board is not in hardware serial bootloader mode then the command
will pause for several seconds before giving up; check the FTDI TX LED
to make sure it is trying to write and that all the ports are configured
correctly on the computer.
\end_layout
\begin_layout Standard
If the upload fails at any point after it has successfully started (eg,
a verification failure) then that microcontroller is questionable and should
NOT be shipped even if a second attempt is successful.
If this happens with many boards then there may be a problem with the FTDI
device, wiring, or USB voltage levels.
\end_layout
\begin_layout Subsection*
Upload test program
\end_layout
\begin_layout Standard
Next is to upload a recent version of the
\begin_inset Quotes eld
\end_inset
interactive test session
\begin_inset Quotes erd
\end_inset
program.
This program can be connected to over SerialUSB and allows a number of
tests to be run; it's helpful for the next testing steps and is also a
nice thing to have preloaded on the board for users to play with.
\end_layout
\begin_layout Standard
We always recompile and upload this program from the 'master' branch of
the libmaple git repository (link above) and then use the 'screen' program
to interact over SerialUSB.
The preferred version is that bundled with v0.0.6; you can checkout exactly
this tag from the git repository.
See
\begin_inset Flex URL
status collapsed
\begin_layout Plain Layout
http://leaflabs.com/docs/libmaple/unix-toolchain/
\end_layout
\end_inset
for directions on getting the unix toolchain set up on Linux; then from
the libmaple top level directory copy ./examples/test-session.cpp to ./main.cpp
and 'make flash'.
It should also be possible to use the
\begin_inset Quotes eld
\end_inset
Example
\begin_inset Quotes erd
\end_inset
version bundled with the IDE, but this is less convenient because the IDE
recompiles the program every time.
Either way, make sure the program is uploaded to FLASH, not RAM (it wouldn't
fit in RAM anyways).
Also make sure that the COMM variable in the source code is set to SerialUSB,
not Serial2.
\end_layout
\begin_layout Standard
To upload the program run 'make install' or press the upload button with
the Maple still plugged in and in perpetual bootloader mode.
Then attach to the SerialUSB device with 'screen /dev/ttyACM0' or the serial
monitor window in the IDE.
You'll usually miss the pretty welcome banner graphics, but you can press
spacebar or send 'h' to see some text thrown back to make sure that the
connection is working.
\end_layout
\begin_layout Subsection*
Test buttons
\end_layout
\begin_layout Standard
\begin_inset Quotes eld
\end_inset
Sticky
\begin_inset Quotes erd
\end_inset
buttons have been a huge QA issue.
This is probably due to overheating of the buttons, bad button quality,
and/or melted plastic inside the button.
The real problem is that it can be hard to detect a partially-working button,
but then very frustrating for the user down the line.
It's possible that a button can work for the first few presses but then
stop working.
It's also common for the button to get electrically
\begin_inset Quotes eld
\end_inset
stuck
\begin_inset Quotes erd
\end_inset
in the pressed state even when it has noticeably disengaged mechanically.
Some sticky buttons feel
\begin_inset Quotes eld
\end_inset
mushy
\begin_inset Quotes erd
\end_inset
, while some feel just fine and still have intermittent issues.
Vigilance is required at this step! It is also not unheard of for the button
to completely
\emph on
fall off the board
\emph default
.
\end_layout
\begin_layout Standard
With the interactive test program running, press 'r' to enter GPIO readout
mode; in this mode all pins are in INPUT_PULLDOWN
\begin_inset Foot
status collapsed
\begin_layout Plain Layout
\emph on
Note: older versions of the test program used INPUT or INPUT_FLOATING mode
and then reported continuous state changes on random pins (especially when
the board is touched).
Make sure to get the latest version of the test program before uploading
it!
\end_layout
\end_inset
mode and any changes of state are printed out.
Press the BUT button repeatedly and the program should report transitions
between HIGH and LOW.
Carefully watch the output while pressing and releasing the button a dozen
times or so and make sure the state changes every time and that there isn't
a significant delay between the physical act and the software update.
\end_layout
\begin_layout Standard
To test the RESET button, detach the serial monitoring program and press
RESET repeatedly.
The blue status LED should turn off and then turn back on and blink every
time.
For efficiency, this step could be performed a little earlier in the QA
assembly line, but be sure both buttons get tested on every board!
\end_layout
\begin_layout Subsection*
Test pins with
\begin_inset Quotes eld
\end_inset
Test Shield
\begin_inset Quotes erd
\end_inset
\end_layout
\begin_layout Standard
The test shield is a second Maple board which toggles every GPIO pin in
a round robin manner and reports any problems.
This modified board gets it's power from the board being tested and runs
a passive program which responds to the '+' mode of the interactive test
program.
\end_layout
\begin_layout Standard
The test shield is constructed by removing all the female headers from the
top of a Maple and soldering on male connectors to the bottom.
All of the GPIO pins plus the Ground and
\begin_inset Formula $V_{in}$
\end_inset
pins must be connected; the only pins can NOT be connected are the power
select header (which should still be on top and in EXT power mode), RESET,
and the
\begin_inset Formula $V_{cc}$
\end_inset
pins.
It's probably easiest to solder male headers for all the female headers
and then break off the
\begin_inset Formula $V_{cc}$
\end_inset
and RESET pins with pliers.
Here's a photo; this particular shield got a lot of use/abuse and one or
two of the male pins have fallen off:
\end_layout
\begin_layout Standard
\align center
\begin_inset Float figure
placement H
wide false
sideways false
status collapsed
\begin_layout Plain Layout
\align center
\begin_inset Graphics
filename shield-bottom.jpg
height 4cm
\end_inset
\begin_inset Graphics
filename test-shield-attached.jpg
height 4cm
\end_inset
\end_layout
\begin_layout Plain Layout
\begin_inset Caption
\begin_layout Plain Layout
Test Shield underside and attached; note that this shield was constructed
from a broken rev1 Maple that needed skywiring and has some missing male
pins on the bottom.
\end_layout
\end_inset
\end_layout
\end_inset
\end_layout
\begin_layout Standard
Once the board is built and has the bootloader flashed, compile and upload
the ./examples/qa-slave-shield.cpp program from the libmaple git repository
(you'll put the power select jumper to USB for program upload, then back
to EXT for use).
\end_layout
\begin_layout Standard
For each board being tested, press on the shield, which should power up
and have the status LED blink.
Enter the interactive test program and send '+'.
It may take a couple seconds to load, but then the program should list
all of the pins and a test status for each.
If the program fails at any pin, or even pauses for a noticeable period
before continuing, there's a problem with that pin.
\end_layout
\begin_layout Standard
The most frequent problem is a shorted or open solder connection at the
headers or at the STM32 pads.
Another problem is that attaching and removing the shield stresses the
male header pins (though NOT the female pins)
\end_layout
\begin_layout Standard
The '+' program is not 100% perfect and may rarely report false failures;
if you think it's not correct or needs tweaking please contact me.
The program fails most frequently at pins 15 and 16.
Also feel free to come up with your own mechanical design; perhaps thinner
male headers or
\begin_inset Quotes eld
\end_inset
pogo-pins
\begin_inset Quotes erd
\end_inset
a la
\begin_inset Flex URL
status collapsed
\begin_layout Plain Layout
http://www.sparkfun.com/commerce/tutorial_info.php?tutorials_id=138
\end_layout
\end_inset
.
\end_layout
\begin_layout Subsection*
Test battery features
\end_layout
\begin_layout Standard
The last step is to test the power select and battery charging circuits.
The most common failure here is the battery charging status LEDs (surface
mount, red and green).
This involves moving the power select jumpers around, the following is
the quickest method we came up with.
\end_layout
\begin_layout Standard
With the Maple powered by USB, close the battery charger jumper with no
battery connected: the state of the circuit is undefined in this configuration,
but after a second or two the green (
\begin_inset Quotes eld
\end_inset
charged
\begin_inset Quotes erd
\end_inset
) LED usually lights up.
The order that the red and green LEDs light up varies from board to board
and is unimportant.
Next attach a not-fully-charged battery: the red charging LED should light
up.
Leaving the battery plugged in, put the charging jumper back in the half-attach
ed configuration, then move the power select jumper to BAT: the blue status
LED should stop blinking when power is detached, then turn back on and
start blinking again.
If all is well, move the jumper back to USB and unplug the battery.
\end_layout
\begin_layout Standard
\begin_inset Newpage pagebreak
\end_inset
\end_layout
\begin_layout Section*
Per-board Preparation and Testing Checklist for LeafLabs Maple (rev4)
\end_layout
\begin_layout Enumerate
\series bold
Brief visual inspection of board
\series default
for missing components or silkscreen smudges
\end_layout
\begin_layout Enumerate
\series bold
Attach 2 jumpers to power select header:
\series default
USB (closed) and Battery Charge (hanging)
\end_layout
\begin_layout Enumerate
\series bold
Flash bootloader
\series default
via hardware Serial Bootloader function (attach USB for power, connect
RX, TX, and GND to FTDI device, upload and verify with stm32loader.py, reset
and check for blinky)
\end_layout
\begin_layout Enumerate
\series bold
Upload Test Program to FLASH via USB
\series default
using perpetual bootloader mode
\end_layout
\begin_layout Enumerate
\series bold
Test Reset and BUT Buttons with 10 pushes each
\series default
by watching the status LED for Reset and using the interactive test program
'r' mode for BUT
\end_layout
\begin_layout Enumerate
\series bold
Run the GPIO test program
\series default
with the test shield attached and the board being tested running the interactiv
e test session in '+' mode
\end_layout
\begin_layout Enumerate
\series bold
Test Battery power circuit and charging LEDs
\series default
by setting the charger jumper with no battery (green LED flickers), attaching
a half-charged battery (red LED), insetting charger jumper (no LEDs), moving
power select to Battery (blue status blinks), then moving power select
back to USB.
\end_layout
\begin_layout Enumerate
\series bold
Put board in a static bag
\series default
and update any database/spreadsheet.
It's ready to ship!
\end_layout